> ## Documentation Index
> Fetch the complete documentation index at: https://stem-docs.intellectualpoint.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Power supply install

> Connect the power cable, understand the power switch, and finish printer assembly.

## Connecting the power

This is the final assembly step and the easiest one: connecting the **power cable**. Once this is done, your Adventurer 5M is fully built.

<iframe src="https://iframe.mediadelivery.net/embed/697805/f1d99e13-36e9-439f-8a5e-d60ae4d0a7f2?autoplay=false&preload=false" style={{ width: "100%", aspectRatio: "16/9", border: "none" }} allow="encrypted-media; picture-in-picture" allowFullScreen />

## Step-by-step

<Steps>
  <Step title="Unpack the power cable">
    Take the power cable out of its bag and remove the twist tie holding it coiled.
  </Step>

  <Step title="Plug it into the printer">
    The shaped end of the cable plugs into the power socket on the **bottom back** of the printer. Push it in snugly.
  </Step>

  <Step title="Leave the switch OFF for now">
    Next to the socket is the power switch. Make sure it is in the **off** position - the side marked with a **circle (O)** means off. The line **(I)** means on. Do not power on yet.
  </Step>

  <Step title="Do not plug into the wall yet">
    Keep the other end unplugged from the wall for now. You will apply power in the next section once the filament is loaded.
  </Step>
</Steps>

<Info>
  On the power switch, the symbols follow the international standard: **O = off**, **I = on**. Keeping it off until you are ready prevents the printer from booting mid-assembly.
</Info>

## Assembly complete

Congratulations - your printer is fully assembled! Here is everything you have done today:

<CardGroup cols={2}>
  <Card title="LCD panel installed" icon="monitor">
    The touchscreen is mounted upright and clicked into place.
  </Card>

  <Card title="Filament tube connected" icon="cable">
    The PTFE tube links the extruder head to the filament sensor.
  </Card>

  <Card title="Base plate freed" icon="square">
    All four shipping screws are removed and the bed moves freely.
  </Card>

  <Card title="Spool holder mounted" icon="disc-3">
    The I-shaped bracket is secured on the back of the printer.
  </Card>

  <Card title="Power connected" icon="plug">
    The power cable is plugged into the printer, switch off.
  </Card>

  <Card title="Ready for setup" icon="circle-check">
    Your machine is built and ready for filament loading and calibration.
  </Card>
</CardGroup>

<Check>
  Pre-assembly is complete: LCD panel installed, base plate freed, filament tube threaded, spool holder installed, and power connected. You are ready to move on.
</Check>

<Tip>
  Tomorrow (Day 3) we bring your printer to life: load the filament spool, power on, connect to Wi-Fi, bind the printer to the Flash Maker app, and run automatic calibration for your first print.
</Tip>
